Train services on the East-West Line (EWL) will fully resume services on Tuesday (Oct 1) from the start of passenger service hours, about a week after a faulty MRT train caused severe damage to the track and trackside equipment.
Ministry of Transport
East-West Line disruption to continue on Sep 30, 2024; Jurong East to Buona Vista section remains closed
Commuters intending to travel between Jurong East (EW24) and Buona Vista (EW21) stations on the East-West Line (EWL) will need to seek alternate modes of transport as regular train services will not resume on Monday (Sep 30) following the major train disruption.
Thomson-East Coast Line 4 begins passenger service; 7 new MRT stations from Tanjong Rhu to Bayshore
The fourth stage of the Thomson-East Coast Line (TEL) began passenger service on Sunday (Jun 23) morning, providing commuters with new access to areas in eastern Singapore that were previously not connected to the rail network.
Thomson-East Coast Line 4 will open on Jun 23, 2024
Seven new MRT stations under the fourth stage of the Thomson-East Coast Line (TEL) will commence passenger service on Jun 23 this year, Transport Minister Chee Hong Tat announced on Tuesday (Mar 5).
Thomson-East Coast Line 4: LTA Hands Over 7 New Stations to SMRT; Slated for Opening in 1H 2024
Seven MRT stations under the fourth stage of the Thomson-East Coast Line (TEL4) have been handed over to rail operator SMRT Trains, the Land Transport Authority (LTA) announced in a Facebook post on Tuesday (Feb 6), signifying another step closer to the TEL4 opening.
Works for JB-Singapore RTS Link Are 65% Completed, On Track for Passenger Service by End 2026
Construction works of the Johor Bahru – Singapore Rapid Transit System (RTS) Link have crossed another milestone, with around 65 per cent completion for both Singapore and Malaysia sides, the Land Transport Authority (LTA) of Singapore said on Thursday (Jan 11).
Construction of Cross Island Line Punggol Extension Has Officially Started, 4 MRT Stations To Open By 2032
The Punggol Extension of the Cross Island Line (CRL) — comprising four MRT stations over 7.3 kilometres when operational — has officially begun construction works on Tuesday (Oct 10).
Sneak Peek of Thomson-East Coast Line 4 – Seven MRT Stations Opening in 2024
Commuters living in the eastern part of Singapore can look forward to the fourth stage of the Thomson-East Coast Line (TEL4), which will be opening in 2024, the Land Transport Authority (LTA) said on Friday (Jul 7), also giving a sneak peek of the stations interior.
SMRT Launches Maintenance Engineering Centre at Kim Chuan Depot
Co-developed with the Land Transport Authority (LTA), rail operator SMRT Trains launched the new Maintenance Engineering Centre (MEC) at Kim Chuan Depot (KCD) on Friday (Apr 28).
Cross Island Line To Start Operating From 2030, Construction Work Has Officially Started
Construction work on Phase 1 of the Cross Island Line (CRL) — Singapore’s eighth and fully-underground MRT line, which spans over 50 kilometres when fully opened — has officially started on Wednesday (Jan 18).