SGTrains.comSGTrains.com ›

Singapore Rail Test Centre is now fully operational, allows all-day testing of trains in Singapore

Singapore Rail Test Centre is now fully operational, allows all-day testing of trains in Singapore

The Land Transport Authority (LTA) announced on Friday (Mar 28) that the 50-hectare Singapore Rail Test Centre (SRTC), located near Tuas Link station on the East-West Line (EWL), has completed construction works and is now fully operational.

Train Services Extended on Eve of Hari Raya Puasa 2025

Train Services Extended on Eve of Hari Raya Puasa 2025

The operating hours for several MRT/LRT lines and bus services will be extended for Hari Raya Puasa on Mar 30, 2025. A compilation of the scheduled departure timings of the last trains at various stations across the train network is provided in this article.

LTA seeks public feedback on new Circle Line wayfinding signage ahead of CCL6 opening in 2026

LTA seeks public feedback on new Circle Line wayfinding signage ahead of CCL6 opening in 2026

The Land Transport Authority (LTA) is seeking the opinion of the public on the upcoming Circle Line (CCL) wayfinding signage in preparation for the opening of CCL stage 6 (CCL6) in 2026. A life-sized mock-up is available for viewing at CCL’s Promenade station from Mar 14-17.

Jurong Region Line will extend to link with Cross Island Line, Circle Line under West Coast Extension

Jurong Region Line will extend to link with Cross Island Line, Circle Line under West Coast Extension

The Land Transport Authority (LTA) has been studying the West Coast Extension, which involves extending the Jurong Region Line (JRL) for improved rail connectivity in the West.

Seletar, Tengah MRT lines being studied, could be combined into a single line and opened from 2040s

Seletar, Tengah MRT lines being studied, could be combined into a single line and opened from 2040s

The Land Transport Authority (LTA) is studying the feasibility of opening two new MRT lines, Seletar Line and Tengah Line, which could serve more than 400,000 households in the 2040s.

Hume MRT station opens for passenger service, is the 1st underground station box fitted on a working line

Hume MRT station opens for passenger service, is the 1st underground station box fitted on a working line

The new Hume (DT4) station on the Downtown Line (DTL) opened for passenger service on Friday (Feb 28), making it the first time that Singapore has fitted out a provisioned station box along an operational MRT line.

LTA, rail operators to investigate root causes of three unrelated MRT disruptions in a week

LTA, rail operators to investigate root causes of three unrelated MRT disruptions in a week

The Land Transport Authority (LTA) and rail operators SMRT and SBS Transit are working closely to identify the root causes of three MRT disruptions in the past week.

Hume MRT station on Downtown Line to open on Feb 28, 2025, located between Hillview and Beauty World

Hume MRT station on Downtown Line to open on Feb 28, 2025, located between Hillview and Beauty World

The new Hume MRT station on the Downtown Line (DTL) will open for passenger service ahead of schedule on Feb 28, 2025, Transport Minister Chee Hong Tat said on Friday (Jan 24).

Train Services Extended for Chinese New Year’s Eve 2025

Train Services Extended for Chinese New Year’s Eve 2025

The operating hours for several MRT/LRT lines and bus services will be extended for Chinese New Year’s Eve on Jan 28, 2025. A compilation of the scheduled departure timings of the last trains at various stations across the train network has been provided in this article.

Downtown Line will extend beyond Bukit Panjang to interchange with North-South Line at Sungei Kadut

Downtown Line will extend beyond Bukit Panjang to interchange with North-South Line at Sungei Kadut

The Downtown Line (DTL) will be extended by two stops beyond Bukit Panjang (DT1) station to connect with the North-South Line (NSL) at the future Sungei Kadut (NS6) interchange station.