Trains are still arriving every 2 minutes during peak hours except that the trains are not jam-packed with commuters. “Daily bus and rail ridership have fallen by more than 71% and 75% respectively” says the Land Transport Authority (LTA) in a press release made on 14 April. With the reduced in ridership, plans were then READ MORE »
Author: Lam
Post Circuit Breaker (Phase 1) on Public Transport
In a Facebook post earlier this evening (19 May 2020), Transport Minister Khaw Boon Wan noted that public transport ridership will increase in tandem with the reopening of workplaces and schools from 2 June 2020. Despite the increase in capacity, adhering to safe distancing would “be difficult” when trains are crowded. To help mitigate the READ MORE »
MRT MKBF crosses 1.4 million km
Mean Kilometers Between Failures (MKBF) for Singapore’s MRT crosses the 1.4 million km mark with the East-West Line achieving 2.5 million km as announced by Transport Minister Khaw Boon Wan in a Facebook post this morning (15 May 2020). This is no easy feat. Success is not built overnight and so is our MRT’s reliability. READ MORE »
What’s coming Post Circuit Breaker?
Covid-19 has disrupted our daily lives and we have almost reached the middle of 2020 battling the virus. As we continue to adapt to the evolving situation, measures and safeguards have been put in place by the Land Transport Authority (LTA) and public transport operators. Before we dive into some issues, let’s take a look READ MORE »



